| Date: |
6-6-2014 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Trim Heat Duct. Prepare bottom foam |
|
|
Re-levelled fuselage and re-bondo'd. Trimmed new stuff. Heat duct is straight & bottom is curved. Adjusted profile, removing 5mm at rear. Sanded all bottom surfaced to be bonded. Cut bottom foam to fit & marked internal positions. Cut to fit perimeter and joined foam with 5 min epoxy. Achieved best joining result so far by taping straight edge to back of join. Box tape dispenser made the job a lot easier. Mixed a new batch for each join and smoothed with old credit card. Both sides of join need no trimming afterward, (for the first time). |
||