| Date: |
7-19-2020 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Fuel feed pipes |
|
|
Spent some shop time re-installing my original epoxy hot box thermostat, and put the temperature probe next to the other one that reads out on the wall. They now agree to within 2 degrees C. They didn't before. Pulled out my tubing cutter and bender and played with tubing for the fuel feeds. Bent up a form from welding rods, and bent up some pipe. Had to re-do one that I cut too short, I'll use that for the delivery. Bent up tubing for the feed from the side blisters to the sump tank and drilled all the holes oversize. Spent a lot of time trying to predict how they would come out, and decided just to give it a go. Worked. |
||