| Date: |
7-16-2020 |
|
| Number of Hours: |
2.20 |
|
| Brief Description: |
Port strake works |
|
|
Filled the rest of the port fuel capicatance probe site with wet MGS flox Sanded some transitions between the top strake skin and the spar. Couldn't think of a single reason I still needed the wing level boards, so knocked them off and cleaned off the bondo. Wings look nicer now. If there is a [Timewarp] about this, please be gentle. Installed port OD bulkhead with flox, as plans, (unlike starboard). Planked the port leading edge to match the starboard. |
||