| Date: |
6-3-2020 |
|
| Number of Hours: |
1.10 |
|
| Brief Description: |
Sight gauges and fuel drains |
|
|
Trimmed the last tapes placed, all OK. Drilled through inside skin through fuel drains, cleaned the threads with a tap and profiled the inside where failed tapes are a bit thick. Trial fitted starboard sight gauge, all OK. Trimmed the port sight gauge inlet tube floxing and added a bit where the jig got in the way, and floxed the first end. |
||