Date:    6-3-2020
Number of Hours:    1.10
Brief Description:    Sight gauges and fuel drains
Trimmed the last tapes placed, all OK.

Drilled through inside skin through fuel drains, cleaned the threads with a tap and profiled the inside where failed tapes are a bit thick.

Trial fitted starboard sight gauge, all OK.

Trimmed the port sight gauge inlet tube floxing and added a bit where the jig got in the way, and floxed the first end.