| Date: |
2-8-2020 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Turtleback drip rail |
|
|
Cut leftover spar tape into individual bunches of strands, 153cm long and set into leading edge of fixed turtleback, approximately 8 strands. Fill remainder with flox, and 2 x BID over the top, lapping onto the drip rail and longerons, and my transitions and turtleback flange repairs. Don't seem to have taken any pictures. |
||