Date:    1-30-2020
Number of Hours:    1.80
Brief Description:    Turtleback drip rail and inner taping
Finished trimming

Marked up interior for tapes and trimmed blobs & blocks.

Didn't really undestand what the drip rail was supposed to achieve at the longerons, so sanded off the irrelevant bits and glued on some core foam with urethane bond to provide a pleasing curve over the longerons. The plan is to achieve a shape over this with the internal tapes, then glass the outside, including a repair of the leading edge.