| Date: |
1-30-2020 |
|
| Number of Hours: |
1.80 |
|
| Brief Description: |
Turtleback drip rail and inner taping |
|
|
Finished trimming Marked up interior for tapes and trimmed blobs & blocks. Didn't really undestand what the drip rail was supposed to achieve at the longerons, so sanded off the irrelevant bits and glued on some core foam with urethane bond to provide a pleasing curve over the longerons. The plan is to achieve a shape over this with the internal tapes, then glass the outside, including a repair of the leading edge. |
||