| Date: |
10-13-2019 |
|
| Number of Hours: |
0.60 |
|
| Brief Description: |
Sump Tank internal layup |
|
|
Using AeroPoxy througout, taped the bulkheads together, 1 x BID wet out on the bench and transferred with peel ply. Found the seat bottom I had cut out some time in the past, and applied 1 x BID on underside and peel plied. 2 x UND inline with and overlapping the bottom layups over the Sump drain and peel ply applied. Cleaned up gear with acetone, which seems to be working fine. |
||