| Date: |
2-7-2019 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Rudder Installation - Coves |
|
|
Rudder Cove layup. Stood each Rudder in turn in the best of my two Rudder stands. Applied 3 x BID overall lapped onto internal Bellhorn both sides, leaving a gap for the hinge. Extra 2 x BID pads over hinge locations. All plies wet out on peel ply and transferred. |
||