| Date: |
12-29-2018 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Winglet installation Layup #2 |
|
|
Filled divots with flox, and in keeping with the structural nature filled foam pores with flox slurry. Did Layup #2, 6 x BID forward of the Rudder conduit, then 2 x BID overall. Peel ply over the IRBH mounting area. Transferred plies 2 at a time on a bit of peel ply, trimming edges with scissors. |
||