Date:    12-29-2018
Number of Hours:    1.50
Brief Description:    Winglet installation Layup #2
Filled divots with flox, and in keeping with the structural nature filled foam pores with flox slurry.

Did Layup #2, 6 x BID forward of the Rudder conduit, then 2 x BID overall. Peel ply over the IRBH mounting area. Transferred plies 2 at a time on a bit of peel ply, trimming edges with scissors.