| Date: |
2-22-2018 |
|
| Number of Hours: |
2.30 |
|
| Brief Description: |
Left Wing, lower skin prep |
|
|
Trimmed glue blobs from yesterdays repair. Ground edges of spar cap to a smooth transition with dremel. Finish sanded bottom Wing surface with 240g sanding block and Spar Cap with 80g. Marked up edges of UND edge lines with a long piece of strapping brace as a ruler. Results seemed at variance with the plans, so made up a 'Swastika Square' from two carpenters squares joined by clecos, with the edges 38" apart, confiming the plans omit a couple of bits. Marked up UND reinforcement areas, and those that will require peel ply. Filled the Wing bolt access hole with a bit of taped foam. A bit later blundered into the wing tip and broke off a few inches. Glued it back on... |
||