| Date: |
1-15-2018 |
|
| Number of Hours: |
1.10 |
|
| Brief Description: |
Left Wing Cores |
|
|
Assembled LFC 2/3/4/5. Assembled fore/aft blocks LFC 1. To avoid the large craters the screws left in the foam assembed all with crossed nails, as per the plans. |
||