Date:    11-29-2017
Number of Hours:    2.90
Brief Description:    Right Wing Cores
Setup and cut bottom spar cap trough RFC2. [Timewarp 13JAN18: Don't do it this way.]

Had a lot of trouble setting up for RFC1 cut, due to the remaining block being marginally small. Having learnt a method to visualise where to stick the templates, I match drilled them along the level line, put nails through both on which I balanced a level, then orient them on either side of the block until I figger where it is all supposed to go. Decide it will all work better if I move the TE as far forward as I can, cross my fingers and set up that way and cut it solo.

Setup bottom spar cap trough RFC2. [Timewarp 13JAN18: Don't do it this way.]

Setup RFC1 profile cut

Setup and "sticked" RFC3/5

Went to work, dragged the missus to the shed on arrival back and rade the RFC2/1 cuts. Not at all happy with the RFC 1. Lengthy joins of skinny pieces in the vicinity of the cap trough look just horrible, and will mean much work later.