| Date: |
12-13-2018 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
TC report #3 |
|
|
"Checked upper and lower wing skins of both port and stbd wings. Checked port and stbd winglet skins All work has been performed to a very high standard OK to fill and paint all fuselage, canard and wings. Next inspection: After engine installation" After a bit of thought I might ask him back before I close out the Strakes. We also discussed that it was not practical to see the structure of the Winglet/Wing join without about 4 inspections. He suggested I just clearly document each step in the process. Thanks for the kind words Len! |
||