| Date: |
9-1-2015 |
|
| Number of Hours: |
1.40 |
|
| Brief Description: |
Elevator counterweights |
|
|
Trimmed CS-10 foam spacer and excess 5-min flox. Offered up elevators, and marked cut line for CS-10 sockets in Canard. Plunge cut sockets with multitool, and hogged out foam. best tool was a bit of 1" square wood, from the instrument panel stiffner jig, with the tip rounded, wrapped in sandpaper. Trial fit STBD elevator with CS-11 fitted, balances strongly nose down, but the tip of CS-10 touched the inside of the upper Canard skin before 30 degrees TE down, even without the 2 x UNI over all. Will have to think about this, but will do PORT side first. |
||