| Date: |
11-26-2019 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Main Spar installation |
|
|
Gave it a couple of days to cure, then checked all the measurements. I am happy! [Timewarp 02DEC19: One measurement I hadn't thought of, today I roughly measured from the Canard tip to the Main Spar tip on each side, and it looks like about a 3mm difference. Hmmmm. Will look at that more accurately tomorrow). Had an absolute arse of a time getting the wedges out, I thought plastic didn't bond to resin, but these were in structurally, and had to be cut/ground out. Roused out the peel ply I had cut sometime previously, and cut all the glass for the tapes. |
||