Date:    11-26-2019
Number of Hours:    1.00
Brief Description:    Main Spar installation
Gave it a couple of days to cure, then checked all the measurements. I am happy! [Timewarp 02DEC19: One measurement I hadn't thought of, today I roughly measured from the Canard tip to the Main Spar tip on each side, and it looks like about a 3mm difference. Hmmmm. Will look at that more accurately tomorrow).

Had an absolute arse of a time getting the wedges out, I thought plastic didn't bond to resin, but these were in structurally, and had to be cut/ground out.

Roused out the peel ply I had cut sometime previously, and cut all the glass for the tapes.