| Date: |
11-14-2017 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Wing CS Spar outer layups |
|
|
Finished access holes. Actually cut out portion, taped the underside of a couple of penetrations of the BID, then covered with a bit of MDF hot glued from the inside. Inside of the spar looks cool, nowhere near as much micro drooling around as I was expecting. Prepped foam and glass. |
||