| Date: |
4-19-2016 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Canard brace |
|
|
BID has arrived! Now have all the foam and glass I need to complete the airframe. Most of it went straight up to the attic, as I won't need it until the Spodplane is in the new shed. Remembering how hard taping inside the nose bowl was I decided not to tape the Canard brace, but copied the plans method of fitting the nose sides. I covered the foam join with masking tape, prepped and 1 x BID over the underside of the brace, leaving a 1" unwet overlap, pinned to the underside with nails. Left it for 1.5 hours until a bit tacky. Roughly floxed the brace in position, released and wet out the overlap. Was a bit short on one side, so put a small tape there. Camera got recalcitrant, and no usable pictures of the part in place. |
||