| Date: |
1-13-2016 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Nose gear doors |
|
|
Set up doors on bench and routed channel for 1/8" fg rods (salvaged from dead kite) to retain the springs. Note half way through that if I had placed the spring over the ip slot in my bench I could have tested the spring operation. Oh well. 5 min rod and spring in place. |
||