| Date: |
1-1-2016 |
|
| Number of Hours: |
2.20 |
|
| Brief Description: |
Nose gear doors |
|
|
Happy new year and all that. Todays activities shaped around 3 Fire Brigade turnouts caused by f*ckwits with fireworks. Trimmed doors and figured inside of the bump to leave about 1/8" foam. Cut some more 1/4" H100 to 1/8" with table saw and hacksaw blade, and figured to cover the rest of the inside of the doors, leaving the hinges and around MKNG-15A glass-glass. Reattached doors to thinned backing boards and left to cure in place. Didn't bond in a couple of places, fixed with 5-min and some foam scraps. Micro'd foam to doors and 2 x BID overall, peel ply on hinge points. Hogged out some foam from the wheel socket bottom foam for the hinge hard points. and prepared for flox corners. Started marking some 1/4" 2024-t3 for hinge inserts. |
||