| Date: |
10-15-2015 |
|
| Number of Hours: |
2.40 |
|
| Brief Description: |
Glassing nose floor |
|
|
Bogged up gaps around nose floor foam. 1 x UNI (plans say BID) over heel area then 2 x BID over all. Plans sort of imply it should go to the edges, but I stopped it short of where the insides of the sides will be to make it easier to shape the outside of the nose. |
||