| Date: |
9-30-2015 |
|
| Number of Hours: |
2.20 |
|
| Brief Description: |
NG-30 outer layup |
|
|
Floxed on ply and small MKNG-6 Al doublers. Was worried they may move around as plies go over the top, so secured the ply with a fibreglass rod peg in 2 corners of each doubler through NG-30 "top" ply. Prepared foam and layed up 4 x BID over outer side of NG-30. Added 1/8" Al doublers to NG-30 and covered with 2 x BID. Added 2 x UNI reinforcement from CN80. Peel plied all the joins |
||