Date:    9-30-2015
Number of Hours:    2.20
Brief Description:    NG-30 outer layup
Floxed on ply and small MKNG-6 Al doublers. Was worried they may move around as plies go over the top, so secured the ply with a fibreglass rod peg in 2 corners of each doubler through NG-30 "top" ply.

Prepared foam and layed up 4 x BID over outer side of NG-30.

Added 1/8" Al doublers to NG-30 and covered with 2 x BID.

Added 2 x UNI reinforcement from CN80.

Peel plied all the joins