| Date: |
9-21-2015 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Preparing Nose Gear Strut |
|
|
Offered up all Nose Strut hardware, and sanded NG-1 to provide clearance for 2 x BID wrap on sides. Intend a bit more BID on the strut end, with the MKNG-6 socket enlarged a bit to suit, to aid retention of the fitting. Cut NG-1 to plans 25.75" length, despite some saying leave it long. Sanded NG-1 smooth with 40g in random orbit sander. Should not have worn shorts, am now as itchy as f(*&, due to the e-glass fibres, they are a bastard! |
||