Date:    3-29-2015
Number of Hours:    1.50
Brief Description:    Brakes and MLG trial install
Finished profiling and prepped MLG Inner Cover and tape surrounds.

Shortened STBD brakeline to relieve strain. Still bleeding...

Installed PORT MK100 stud and nuts for trial assembly. As intended back in the installation of the MG-1/2 / MKNG there is room for one AN960-816L each side and there is no play when tightened.