| Date: |
1-25-2015 |
|
| Number of Hours: |
7.10 |
|
| Brief Description: |
MLG Tab inner layup. LB fus layup |
|
|
Prepped strut for inner Tab layups, filled pilot hole with wax. Rejigged clamping boards to fit inside Tabs and re-taped. Layed up MLG Tab inner tabs, same as the outer. Layed up LB fuselage cutout and inner surface LB. [Timewarp 26/01/15: Too much, did a crap job on the fuselage, can barely look at it, will have to sand most of it off. Need some thin plastic and more foam to follow this complex a shape. Was too tired to do it properly. Decide to follow the plans in future and do it step by step instead of two different steps at a time.] |
||