| Date: |
1-12-2015 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Brakeline conduit / LB hinge |
|
|
Filled gaps with micro and layed up 2 x BID over conduit, using 3" tapes on peel ply. Micro not stiff enough port side, I can see voids, will fill later. Finished prep on LB hinge. Assembled LB-19 to hinge and tacked to LB-23 with Al spacers in between. Trimmed Landing Brake, removed 3/4" of foam from LE, just realising it was in the way of the hinge. Used leftover micro to fill seatbelt outer holes and hard-shelled Landing Brake. |
||