| Date: |
1-10-2015 |
|
| Number of Hours: |
2.30 |
|
| Brief Description: |
Brakeline conduit |
|
|
Peel ply in strips was a STUPID idea, took ages to strip it off a bit at a time. Plans tells you to unmount the strut to sand it all flat, but I don't see the point. Sanded rear half with random orbit sander and 36grit, and will sand back the rest after the conduit BID is applied, meaning I only invert the strut once. Hot glued on the coreflute to support the conduit, then 5-min on the 12mm flexible conduit. Cut peel ply for conduit BID. Cut Landing Brake hinge at 12", sanded and scotch brited. |
||