| Date: |
11-28-2014 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
MLG strut preparation |
|
|
Joined tables side-by-side and levelled with threaded rod and levelling blocks. Screwed stand-off blocks to bench, added some long 10g screws, roughed them up and 5-min flox'd MLG strut on LE down. Seemed to work easiest to prop it in position, lift the strut at each point and butter some 5-min flox on, and leave a little while before playing with it. Tried hot glueing the coreflute backups for the fairings, worked OK, but they have to come off as the first torsional layup comes first. |
||