| Date: |
6-12-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Installed the flap drive pivot blocks and flap dri |
|
|
I installed the flap drive pivot blocks and flap drive. The Phenolic blocks had to be remade twice to get it right. |
||