| Date: |
5-22-2013 |
|
| Number of Hours: |
2.25 |
|
| Brief Description: |
Build dual control stick assembly. |
|
|
Today I built the dual control stick assembly. I had previously used JB Weld to install the flanged bushing into the A frame assembly. The plans called for the bushing to be press fit but was too loose to press in. Sonex recommended JB Weld. It seems to have worked well. |
||