| Date: |
2-9-2012 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
Starting to position and clamp fuselage parts toge |
|
|
Starting to position and clamp fuselage parts together. I am pondering how to be certain that the fuselage halves are aligned and squared. I think I am going to either cut down the table smaller and shorter, or rig up saw horses to build on. I am thing about screwing angle pieces into the build table along the edge of the lower longerons to hold the halves in the correct position. |
||