| Date: |
1-28-2012 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Drill right aft fuselage skin vertical zees. |
|
|
I fastened the aft fuselage skin to the newly constructed rack with clamps and 2 bungee cords. I then clamped into position the vertical zees onto the aft fuselage skin. I pilot drilled, clecoed and updrilled the vertical zees. I removed and loaded the left aft fuselage skin assemply and repeated the process. I then updrilled the left longerons and removed all of the clecoes to start deburring. |
||