Date:    1-28-2012
Number of Hours:    1.00
Brief Description:    Setup rack to position work on aft skins.
After some serious head scratching I came up with an idea for a rack to hold the aft skins while I measured, positioned and drilled the holes for the vertical zees. It worked out really well.