| Date: |
1-28-2012 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Setup rack to position work on aft skins. |
|
|
After some serious head scratching I came up with an idea for a rack to hold the aft skins while I measured, positioned and drilled the holes for the vertical zees. It worked out really well. |
||