Date:    1-17-2012
Number of Hours:    1.75
Brief Description:    Clamped and drilled longeron to right side skin.
Clamped the lower right longeron to the fuselage skin. Looks pretty easy so I drilled and clecoed.

Received the replacement channel material from Sonex today to make F27-05 Left and Right vertical channel pieces for the aft fuselage.