| Date: |
1-13-2012 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Step drilled the 5/16, 3/4, and 1 inch holes in th |
|
|
Step drilled the 5/16, 3/4, and 1 inch holes in the aft fuselage vertical channel. Next I still need to make vertical channel #5 left and right. It is made from the same channel stock that i made the tail post from. I remade the tail post and never ordered more stock. So now I will. |
||