Date:    3-7-2019
Number of Hours:    1.50
Brief Description:    Opened up the leading edge inboard rib.
I opened up the right wing leading edge inboard rib in order to allow my fat hand to access the connection of the flap drive after the wings are installed. I will do the same to the left wing.