Date:    4-17-2017
Number of Hours:    5.00
Brief Description:    Start rigging wing process.
Several hours leveling wings for an other attempt at rigging wings. Fuselage leveled forward and aft. The alignment pins are in and the wings are level with the water level. I used bottle jacks about 1/3 out from the fuselage to level the wings. I also used shims between the two spars to help secure from movement. Additionally, I used two large C-clamps to hold the spars together.