| Date: |
11-21-2010 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Aileron Bellcrank and box. |
|
|
Today I pilot drilled and clecoed the left and right Aileron Bellcrank and box on #9 ribs. I can not reach the flange of the ribs with my angle drill and will order a long flexible bit that may help. The cotter pin is missing in the photo below because I will have to take apart again before final riveting. |
||