Date:    11-20-2010
Number of Hours:    5.00
Brief Description:    Aileron Bellcrank Assemblies
Built 8 clips 21-09 along with the Aft and Forward Vertical Channel pieces and prepared other parts in photo below for the Aileron Bellcrank Assemblies. Finished the assemblies and studied plans for the attachment to the #9 rib.