| Date: |
6-5-2018 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Installed the panel and panel cross support. |
|
|
Installed the Panel cross support and upper and lower pane. Also the throttle and mixture controls. Next up is to start the final wiring. |
||