| Date: |
5-15-2017 |
|
| Number of Hours: |
4.25 |
|
| Brief Description: |
Installed the Aileron and Flaps controls |
|
|
Today I installed the Flaps and Ailerons and completed the temporary attachments of the Aileron and Elevator contriol surfaces. There was nothing to difficult about that. I installed the push rod control for the flaps however getting into the lightning hole to connect the flap push rod to the flap drive is very difficult. |
||