| Date: |
4-9-2010 |
|
| Number of Hours: |
5.75 |
|
| Brief Description: |
Fuse: Hook Mount and Cap Assembly |
|
|
Started and completed the F10-06 Hook Mount and the F10--02 Cap Assembly. The latter required a lot of measuring and drilling. It will become the point where the seat bottom attaches to the fuselage floor. |
||