Date:    7-22-2009
Number of Hours:    2.00
Brief Description:    Horiz Tail: Prep HS frame for riveting
* Shimmed tip ribs on both sides to make them parallel to skin pilot holes.
* Drilled up pilot holes to #30 size and clecoed.