| Date: |
1-27-2009 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Ailerons: Cut and drilled Aileron Hinges and more |
|
|
* Cut and drilled the Aileron Hinges. * Once setup and in a rhrythm, and seeing how vulnerable those flexible 6 foot lengths of stock are, decided to go ahead and cut all the hinge material to length using the Material Planning Guide on page SNX-B07.9 of the Builder Checklist. This led to a fair amount of figuring, since some of the stock was already used for the tail section. |
||