| Date: |
1-27-2009 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Aileron Hinges |
|
|
Cut and drilled the aileron hinges. Then decided to cut all the hinge materials to length using the Material Planning Guide on page SNX-B07.9 of the Builder Checklist. |
||