Date:    11-30-2008
Number of Hours:    7.00
Brief Description:    Vertical Stabilizer Assembly
11/22/08 1.5 hrs. Clecoed frame together and updrilled to #30 holes.
11/23/08 2.0 hrs. Drilled #40 pilot holes in left side of frame using pre-drilled skin as a guide.
11/27/08 1.0 hrs. Updrilled holes on left side to #30 with Eric Stoddard helping.
11/29/08 1.0 hrs. Deburred all rivet holes on left side of frame.
11/30/08 1.5 hrs. Riveted left side skin to frame (Eric, Amy and Lise all contributed).