Date:    9-11-2018
Number of Hours:    1.50
Brief Description:    Trimmed leading edge material, riveted actuator, c
I trimmed away the material on the leading edge per plans. I riveted the electric trim actuator in place. I drilled/clecoed hinge bracket in place on leading edge of main spar.