| Date: |
9-10-2018 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Begun skin installation, top and bottom |
|
|
I marked out all of the rivet locations for the bottom skin on the skeleton, and drilled out the pilot holes before fitting onto the skeleton and clecoing in place. I then flipped the structure over marking out and drilling pilot holes for the rivet locations on the top side of the skin. |
||