| Date: |
9-10-2018 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Installed rear ribs and nose ribs on elevator spar |
|
|
Using my plans, I marked out the center line and all of the rib locations on the main spar for the elevator. I then drilled and clecoed in place all of the rear ribs and nose ribs to the main spar of the elevator. |
||