Date:    9-10-2018
Number of Hours:    1.00
Brief Description:    Installed rear ribs and nose ribs on elevator spar
Using my plans, I marked out the center line and all of the rib locations on the main spar for the elevator. I then drilled and clecoed in place all of the rear ribs and nose ribs to the main spar of the elevator.