| Date: |
8-29-2018 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Rivited skin, Cutout hole for elevator cable on le |
|
|
With all the brackets rivited in place, I rivited the top of the stabilizer skin in place. Flipping over the stabilizer, I marked and made the cutout for the elevator cable hole. With the leading edge hole cutout and deburred, I fabricated the adjacent L-bracket and clecoed it in place. |
||