| Date: |
8-28-2018 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Drilling and Clecoing Bottom stabilizer skin to sk |
|
|
I marked out all of the rivet holes on the bottom of the stabilizer skin, and drilled out the pilot holes. Then I laided the skin on the stabilizer skeleton and drilled/clecoed in place. |
||